The Complete Bathroom Remodel Checklist

Quick answerDecide in this order: scope tier, layout, tub vs. shower, budget plus 10–15% contingency — then order long-lead items (vanity, tile, tub/shower, in-wall valve) before any demo. Everything living inside a wall must be on site before drywall closes; grout color, paint, lighting, and hardware can follow. Confirm permits and deliveries before demo day.

Bathroom remodels stall on undecided selections more than on labor. This checklist puts every decision in the order your project needs it — decide top to bottom and your remodel never waits on you.

Print it, share it with whoever shares the bathroom, and settle each section before the phase that needs it.

Phase 1 — Before quoting (the big rocks)

Phase 2 — Order-ahead selections (long lead times)

The rough-in ruleAnything living INSIDE a wall — shower valve, niche, blocking for grab bars or floating vanities — must be decided and delivered before drywall closes. Everything after that is surface; everything before it is surgery.

Phase 3 — Finish selections

Phase 4 — Confirm before demo

Frequently asked questions

How much tile overage should I order?

10% for straight lays, 15% for diagonals/patterns. Leftover boxes are future repair gold — store them.

What's the most-forgotten item on this list?

The in-wall shower valve. Everyone picks the pretty trim; the valve behind it is what rough-in actually needs.

Comfort-height toilet — really?

Yes. Two inches taller, universally preferred once lived with, identical cost. The easiest yes on the list.

Do I need a designer for a small bathroom?

Usually no — this checklist plus a contractor who sketches layouts covers a standard bath. Unusual spaces or high-end finishes: a design consult pays for itself.