Home / Guides / Costs & Pricing

Costs & Pricing

Flooring Installation Cost in the Chicago Suburbs

Quick answerInstalled flooring in the Chicago suburbs typically costs $6–$12 per square foot for luxury vinyl plank, $5–$10 for laminate, $10–$18 for engineered hardwood, $12–$22 for solid hardwood, and $14–$25+ for tile — plus $1–$3 per square foot for tear-out and any leveling or subfloor repair, which is common in homes over 50 years old.

Flooring quotes vary wildly because half the real cost hides in prep — tear-out, leveling, and subfloor repair. Here's honest per-square-foot math for the materials Chicagoland homeowners actually choose.

Ranges below include professional installation at typical 2026 north-suburb rates; materials at mid-tier quality.

Installed cost by material

MaterialInstalled, per sq ftNotes
Luxury vinyl plank (LVP)$6–$12Waterproof, fast install, best all-around value
Laminate$5–$10Budget-friendly; weaker against standing water
Engineered hardwood$10–$18Real wood surface, more stable in our humidity swings
Solid hardwood$12–$22Refinishable for generations; needs acclimation
Tile$14–$25+Labor-heavy; unbeatable in baths, entries, mudrooms

Add tear-out and disposal ($1–$3/sq ft), and leveling or subfloor repair where needed — common in homes over 50 years old.

What moves your price

Chicago climate noteOur 90°F humid summers and bone-dry winters make wood move. Solid hardwood needs on-site acclimation and correct expansion gaps; engineered wood and LVP shrug the swings off — a big reason LVP dominates suburban installs now.

These are market ranges — your exact number is one free estimate away. Free quote · (224) 551-3643

Frequently asked questions

What's the best flooring for Chicagoland homes?

LVP for kitchens, baths, and basements; hardwood (solid or engineered) for living areas where warmth and resale appeal matter. See our hardwood vs. LVP comparison for the full decision.

Can new flooring go over old flooring?

Sometimes — LVP often floats over one existing hard layer if it's flat and sound. Multiple layers, soft spots, or height problems at doors mean tear-out is the right call.

How long does installation take?

A typical 500–800 sq ft main level: 2–4 days for LVP or laminate, 3–5 for hardwood, longer for tile.

Do baseboards have to come off?

Best results, yes — or add shoe molding. Quotes should say which; it changes both look and price.

Cost figures are typical Chicagoland market ranges for planning purposes, current as of 2026, and are not a quote. Every project is priced individually after an on-site estimate — condition, selections, and scope change the numbers.

Planning this project?

Get a Free Quote  Call (224) 551-3643